Both main Bangkok bus terminals to be relocated

Anything and everything about Thailand
Post Reply
User avatar
Gaybutton
Posts: 21588
Joined: Sat Jul 31, 2010 11:21 am
Location: Thailand
Has thanked: 2 times
Been thanked: 1322 times

Both main Bangkok bus terminals to be relocated

Post by Gaybutton »

That's the Bang Sue terminal. If you're not sure where that is, go to Google Maps and enter: Krung Thep Abhiwat Central Terminal
_____________________________________

Ministry plans to relocate city bus terminals

by Supoj Wancharoen

February 28, 2024

The Transport Ministry is planning to relocate the Eastern Bus Terminal (Ekkamai) and the Bangkok Bus Terminal (Mo Chit 2) to the Krung Thep Abhiwat Central Terminal, Transport Minister Suriya Jungrungreangkit, said on Tuesday.

Mr Suriya said the proposed relocation would provide travellers with more convenience as the Central Terminal is easily accessible via the MRT electric rail system. He said both stations in the new location will share a high-rise facility, with each floor serving a different route and an air-conditioned food centre located in the main hall.

No time frame has been given for the planned relocation.

Despite such developments, Mo Chit 2 Terminal in Chatuchak is currently undergoing an upgrade, with parts of the terminal closed for renovation. Mr Suriya said the upgrade, which includes safety measures and a security system, is expected to be completed within 18 months. However, the terminal should be ready to handle Songkran travellers by April.

He also gave an update on construction delays on Rama II Road in Hua Hin, saying he ordered the Department of Rural Roads to use a scorebook system with the contractors to help keep track of construction deadlines. Those low-scored contractors will be blacklisted from working with the ministry and the DRR in the future, he explained.

Prime Minister Srettha Thavisin previously ordered the Transport Ministry to speed up the long-overdue construction after a popular online survey found congestion along Rama II Road put tourists off the resort town of Hua Hin.

Mr Suriya said the construction, which consists of 10 contracts, is expected to be finished in June 2025, an extension from the former deadline in January. The contractor's financial difficulties due to the pandemic and the DRR's regulation that allows the construction to be carried out only at night to avoid traffic congestion led to the road construction being delayed, he added.

https://www.bangkokpost.com/thailand/ge ... -terminals
User avatar
Jun
Posts: 596
Joined: Mon Jul 10, 2023 8:43 pm
Has thanked: 107 times
Been thanked: 87 times

Re: Both main Bangkok bus terminals to be relocated

Post by Jun »

Krung Thep Abhiwat is a significant walk from the MRT, mainly due to daft convoluted walkways from the MRT to the railway station. Then once in the station, it is so oversized you might need to walk over 500m to reach the end of the platform from which the train departs.
The BTS skytrain station is even further away. Google maps shows a 2.8km walk.
I guess the transport minister has never tried any of this himself.

Incidentally, buses arriving at Mo Chit will often make a separate stop right next to Mo Chit BTS & Catuckak MRT station. Getting out here saves a lot of walking.
User avatar
Jun
Posts: 596
Joined: Mon Jul 10, 2023 8:43 pm
Has thanked: 107 times
Been thanked: 87 times

Re: Both main Bangkok bus terminals to be relocated

Post by Jun »

There's also a third large Southern bus terminal, naturally located a long way from any of the red line train stations. I travelled to that by bus last time I used it.
Post Reply